Search


Current Projects

CURRENT PROJECTS


Rehabilitations of Hydroelectric Power Plants

The scope of supply of the project is the complete rehabilitation of two hydroelectric power plants. Each power plant consists of 2 Francis Turbines groups (25MW each turbine). The total electric power generation of the system is 100 MW. The project involves intervention for rehabilitation of the turbines, the generators, the electric systems of automation and control, the electric systems of substation and the systems of data transmission and communication, with the objective to extend its useful life for another additional 25 years. The main technical data of the installed machines are:

Turbines Generators Transformers
PSB 2 FV ESCHER WYSS 2 ELIN
2 ELIN (31,5 MVA)
H = 196,00 m 10,5 Kv,
Q = 16 m3/s 60 Hz,
rpm 514 31,5 MVA
TCA 2 FV Franco Tosi ASGEN 1 Siemens (31,5 MVA)
H = 267,5 m 10,5 Kv, 1 NATION TRASF (31,5 MVA)
Q = 11m3/s 60 Hz,
rpm 600 31,5 MVA

The rehabilitation of the power plants will drive some key advantages.The substitution of the electric and electronic systems will involve the possibility to operate with greater values of general efficiency, optimizing the water flow and operations. Moreover the substitution of the systems will allow to use a renewable technology according to sustainable use of the water resources of the basins. The project will probably allow to access the market of the green certificates (CER's) for the sale of the missed CO2 certificates.